Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
blog:our_paper_on_cram_has_been_accepted_to_icra_2021 [2022/06/01 10:21] – [Our paper on CRAM has been accepted to ICRA 2021] gkazhoya | blog:our_paper_on_cram_has_been_accepted_to_icra_2021 [2022/06/16 14:57] (current) – [CRAM @ ICRA 2021] gkazhoya | ||
---|---|---|---|
Line 7: | Line 7: | ||
CRAM takes care of action planning, parametrization and execution in the system, including failure handling. | CRAM takes care of action planning, parametrization and execution in the system, including failure handling. | ||
- | It also integrates all the system components together, | + | It also integrates all the system components together. |
You can access the paper [[https:// | You can access the paper [[https:// |